QA and Acceptance Testing
Quality Assurance and Acceptance Testing. The contractor shall perform quality assurance inspections to ensure that the contractor is adhering to the referenced standards and practices. These inspections will include, but not be limited to, inspections of maintenance hole and duct bank installation, inside plant, cable termination, rack/cabinet installation, building entrance, etc. A trip report shall be submitted within five working days upon return to duty station. On-site QA inspections shall include on-the-spot and/or random inspections and will include, but not be limited to, the inspections listed above. A final QA inspection will be conducted prior to a final acceptance. During the final inspection, the contractor will verify the redline drawings and inspect all completed installation.
I need 2 of those. 1 at Ft. Lee, VA and one at Ft. Benning, GA for 1-2 years.
I also need a SITT and an FAE to live in Korea for 1-2 years with the same skills. Obviously the FAE would be a even more senior guy.
Devin Sappington
Business Development
MTC Technologies, Inc.
1227 South Patrick Drive
Suite 600
Satellite Beach, FL 32937
W: 321-777-2449
C: 321-704-9188
Fax: 321-773-9303
devin.sappington@mtctechnologies.comwww.mtctechnologies.com