Who owns the base/infrastructure?
Have them show you the technical reference...there should be installation documentation for acceptance and someone signed that the installation met the standards required
From Atch 1 (old) ACC INSTRUCTION 33-104 ENGINEERING INSTALLATION (EI) PROCEDURES dated 30 NOVEMBER 2005
http://www.milvet.state.pa.us/air_national/lightningforce/forms%20and%20pubs/ACCI%2033-104%20EI%20Procedures.pdf {if I remember correctly these TO were dual marked w/Army designators}
AFTO 31-10-2, Fanning and Forming Conductors for Ground C-E Equipment
AFTO 31-10-3, Outside Plant Installation
AFTO 31-10-24, Communications Systems Grounding, Bonding, and Shielding
AFTO 31-10-34, Fiber Optics Communications Cables and Connectors
AFTO 31W3-10-12, Outside Plant Cable Placement
AFTO 31W3-10-13, Outside Plant Cable Splicing
AFTO 31W3-10-14, Outside Plant Cable Termination
AFTO 31W3-10-15, Outside Plant Cable Testing
AFTO 31W3-10-16, Outside Plant Pressurization
AFTO 31W3-10-19, Telephone, Outside Plant Installation, Poleline
AFTO 31W3-10-20, Telephone Outside Plant Installation, Drop and Block Wiring and Station Installation
AFTO 31W3-10-21, Outside Plant Cable Maintenance and Repair
AFTO 31W3-10-22, Outside Plant Telephone
31W3-10-22 SIGNAL MNL -- TELECOMMUNICATIONS ENGINEERING, OUTSIDE PLANT, TELEPHONE Rev 1 (paper) 15 Sep 2009
FM 11-486-5 Telecommunication Engineering: Outside Plant Telephone
AFTO 31Z-10-2, Prevention and Elimination of Interference of C-E Equipment
or try
85 EIS/SCQA, 670 Maltby Hall Dr, Bldg 7701, Keesler AFB, MS 39534-2633
POC: 85 EIS/ SCQA
Email:
85EIS.SCQA@keesler.af.milor
DSN: 597-3929/1197